A team sends its standards list for a Wi-Fi smart plug to a test lab: EN IEC 62368-1 for safety, EN 55032 and EN 55035 for EMC. The quote comes back with a question. Where are the radio standards? The plug has a 2.4 GHz transmitter, so it falls under the Radio Equipment Directive, and the list stopped at safety and EMC. (The smart plug is an illustrative example, not a specific product. We'll follow it through every step below.)
That kind of gap is typical of first EU launches. One set of rules covers all 27 member states, but several instruments apply at once, each points to its own harmonised standards, and the documentation asks for more than most teams expect. This roadmap runs from scoping to the day the product reaches European shelves.
Step 1: map your product to the EU legislation that applies
A product placed on the EU market has to meet every piece of legislation that covers it. For consumer electronics without a radio, the usual core is:
- the Low Voltage Directive (2014/35/EU) for electrical safety;
- the EMC Directive (2014/30/EU) for electromagnetic compatibility;
- the RoHS Directive (2011/65/EU) for hazardous substances.
Radio equipment works differently. Anything with a transmitter (Wi-Fi, Bluetooth, NFC, cellular, Zigbee) falls under the Radio Equipment Directive (2014/53/EU), and RED takes over safety and EMC as well: Article 3(1)(a) covers safety with no lower voltage limit, and Article 3(1)(b) covers EMC. Since 1 August 2025, internet-connected radio products have also had to meet the cybersecurity requirements of Delegated Regulation (EU) 2022/30.
Other instruments depend on the product:
- Batteries: the Battery Regulation (EU) 2023/1542, whose obligations phase in over several years (removability and replaceability of portable batteries from 18 February 2027, supply-chain due diligence from 18 August 2027, and later targets into the 2030s).
- Digital elements: the Cyber Resilience Act, Regulation (EU) 2024/2847, in force since December 2024. Its reporting obligations have applied since 11 September 2026, and its main requirements apply from 11 December 2027.
- Energy use: implementing regulations under the Ecodesign Directive 2009/125/EC, such as the standby and networked-standby limits of Regulation (EU) 2023/826, and over time the delegated acts of the Ecodesign for Sustainable Products Regulation (EU) 2024/1781.
- End of life: the WEEE Directive, covered in Step 7.
For the smart plug, that means at least three instruments: RED (covering safety, EMC and radio, plus cybersecurity through 2022/30), RoHS and WEEE. It also needs a check of whether 2023/826 applies to its networked standby. Miss one and the Declaration of Conformity is incomplete. An incomplete DoC leaves the product non-compliant even if it passed every test that was run.
Step 2: identify the harmonised standards
Each directive relies on harmonised standards: technical specifications from the European standards bodies (CEN, CENELEC and ETSI) whose references the Commission publishes in the Official Journal. Applying one gives a presumption of conformity with the requirements it covers. A typical consumer electronic product draws on:
- Safety: EN IEC 62368-1.
- EMC: EN 55032 for emissions and EN 55035 for immunity (multimedia equipment), or, for radio products, ETSI EN 301 489-1 plus the part for the radio type.
- Radio: the ETSI standard for the band, such as EN 300 328 for 2.4 GHz wideband transmission.
- RF exposure: for a product used away from the body, usually EN 62311 or EN 62479.
- RoHS documentation: EN IEC 63000.
Check the Commission's harmonised standards lists for the edition currently cited. Standards get revised, and a withdrawn edition loses the presumption of conformity after its cessation date.
Step 3: design and pre-compliance
With the legislation and standards mapped, build the requirements into the design: creepage and clearance distances per the safety standard, EMC (grounding, shielding and filtering), components carrying the right safety approvals, and materials that meet the RoHS limits.
Run pre-compliance EMC testing on the first prototype, when a fix is still cheap. Our guide to EMC design choices that decide a CE marking application covers the layout decisions that matter most.
Step 4: formal testing at an accredited laboratory
Send a production-representative sample to a laboratory accredited to ISO/IEC 17025 for the relevant test methods by a national accreditation body. For the smart plug, the campaign covers safety and RF exposure, EMC and radio, and energy measurements if an ecodesign regulation applies. Radio products need more test time than mains-only products, because the radio standards add their own measurements on top of safety and EMC.
If the product also targets the US, ask the lab to quote a combined campaign. Our comparison of FCC Part 15 and CE EMC requirements explains which measurements overlap.
Step 5: compile the technical file
The technical file is the evidence behind your declaration. You must keep it available to market surveillance authorities for ten years after the product is placed on the market (Article 10(3) of RED; the LVD and EMC Directive set the same period). It typically holds:
- a general description of the product, with photographs;
- the list of legislation and harmonised standards applied;
- design documentation: schematics, PCB layouts and mechanical drawings;
- a risk assessment against the essential requirements of each directive;
- test reports;
- the bill of materials with RoHS substance declarations;
- the user manual and installation instructions;
- label and marking artwork;
- production quality documentation.
Incomplete technical files are a common market surveillance finding. Usually a directive or a test report fell out along the way.
Step 6: issue the EU Declaration of Conformity
The EU Declaration of Conformity (DoC) is the document in which you, as the manufacturer, declare that the product meets every applicable requirement, and you are legally responsible for it. Each directive's annex sets its contents, which include:
- your company name and full address;
- the product identification (model and type reference);
- the legislation it conforms to;
- the harmonised standards applied, with their editions;
- the place and date of issue;
- the name, function and signature of the person signing.
For radio equipment, Article 10(9) of RED requires each unit to ship with a copy of the DoC or a simplified DoC that gives the internet address of the full text. Keep the signed DoC in the technical file.
Step 7: apply CE marking and prepare for market
CE marking
Affix the CE marking visibly, legibly and indelibly to the product, or to its packaging and accompanying documents if the product is too small. Under Annex II of Regulation (EC) No 765/2008 it must be at least 5 mm high and keep its proportions.
The EU responsible economic operator
Article 4 of Regulation (EU) 2019/1020 requires an economic operator established in the EU for most CE-marked products. That can be the manufacturer, an importer, an authorised representative you appoint, or a fulfillment service provider. If you have no EU establishment and sell through an EU importer who takes on the role, you may not need a separate authorised representative. Either way, the operator's name and contact details must appear on the product, its packaging, the parcel or an accompanying document.
WEEE and battery registration
Under Article 16 of the WEEE Directive (2012/19/EU), you must register as a producer in each member state where you sell. A battery adds producer registration under the Battery Regulation, which replaced the old Batteries Directive. Our guide to the environmental compliance stack covers both, with the dates.
Post-market obligations
CE marking continues after launch. You update the technical file when standards change, monitor the product for safety problems, and answer market surveillance requests within the deadlines they set. Under the General Product Safety Regulation (EU) 2023/988, which has applied since 13 December 2024, Article 20 requires you to notify accidents caused by your product through the Safety Business Gateway. Safety Gate, formerly RAPEX, is the authorities' own alert system, where serious cases get published.
Authorities find non-compliant products through customs checks, market sampling and complaints. They can order a withdrawal or a recall, and national law sets the penalties.
Fix the scope before you book the lab
Back to the smart plug. The missing radio standards cost the team a re-quote and a reshuffled test schedule. Caught at Step 1, they would have cost one line on the standards list. Most delays on a first EU launch trace back to scoping like that, so settle Steps 1 and 2 before you book test time. When a scoping question comes up, such as whether the smart plug needs a Notified Body under RED Article 17, you can ask NavJun and check the article it cites before you commit to a test plan.